Replacement of an existing three-span, rolled steel multi-beam bridge over T-555 (Crackersport Road) with a simple span, steel plate girder bridge utilizing Accelerated Bride Construction (ABC) Methods. The work also includes embankment widening and approach roadway tie-ins.